PROJECT DESCRIPTION
|
29,000 sf Sanctuary Addition
Value Engineering Reduced costs by $2,000,000!
Precast Concrete Panels increased insulation value and decreased costs.
|
Castleton United Methodist Church came to T&W with a large challenge. After spending over a year with another design-build team, their budget of $3,600,000 for the building was exceeded by $2,000,000. The challenge was to deliver the very traditional, colonial, 28,820 square foot facility for less than $125/sf, reducing almost $70/sf without reducing valuable ministry space. In a highly collaborative, high energy environment, the T&W Church Solutions team delivered.
On September 17, 2006, Castleton United Methodist Church broke ground for their new Worship Facility! Pastor Mac Hamon (left) climbed into a CASE 580 backhoe, and "dug in" to start the job off right.
Later during the ceremony the congregation joined hands around a pre-sprayed outline of the new facility while a photographer climbed a ladder truck and took an impressive arial photo (below). What an awesome sight...
Current Project Photographs - Taken 06/28
Click
HERE to see what Pastor Mac Hamon has to say about his T&W Church Solutions experience.
More on the project to follow...